Murphy Realized Work
       
     
DIRECTV Super Saturday Night, 2014 New York
       
     
DIRECTV Super Bowl Structure, 2014 New York
       
     
DIRECTV Super Saturday Night, 2014 New York
       
     
Dew Tour - Mountain, 2013 Breckenridge
       
     
Qualcomm Product Launch, 2013 New York
       
     
Qualcomm Product Launch, 2013 New York
       
     
Qualcomm Product Launch, 2013 New York
       
     
Dew Tour - City, 2013 San Francisco
       
     
Dew Tour, 2012 Ocean City
       
     
Dew Tour - Beach, 2012 Ocean City
       
     
Dew Tour Experience, 2012 - 2014
       
     
DIRECTV Studio, 2013 New Orleans
       
     
Hot Wheels Double Dare, 2012 Los Angeles
       
     
Murphy Realized Work
       
     
Murphy Realized Work

Murphy believes in holistic design from overarching concept until  details . We design and build to challenge the laws of gravity and innovate to encompass the obstacles of each unique site and project.

DIRECTV Super Saturday Night, 2014 New York
       
     
DIRECTV Super Saturday Night, 2014 New York

Murphy designed steel center pieces weighed 15 000 pounds each, which is equal to two average elephants.

Photo by Bo Bridges

DIRECTV Super Bowl Structure, 2014 New York
       
     
DIRECTV Super Bowl Structure, 2014 New York

February 2nd, 2014

700 linear feet of 12' high double sided firewall was built around the tent to grow the allowed capacity of 1800 to 7500.

Photo by Bo Bridges

DIRECTV Super Saturday Night, 2014 New York
       
     
DIRECTV Super Saturday Night, 2014 New York

Second level around three sides of the venue was custom built which enabled as long as 20' spans between columns in opposed to 8' of scaffolding spans.

Photo by Bo Bridges

Dew Tour - Mountain, 2013 Breckenridge
       
     
Dew Tour - Mountain, 2013 Breckenridge
Qualcomm Product Launch, 2013 New York
       
     
Qualcomm Product Launch, 2013 New York

Custom made interior installments were created to give an exisiting venue an identity of the brand Qualcomm.

Qualcomm Product Launch, 2013 New York
       
     
Qualcomm Product Launch, 2013 New York

Special led lit food trays portray the high-tech vibe that was carried through from details to the entire space.

Qualcomm Product Launch, 2013 New York
       
     
Qualcomm Product Launch, 2013 New York

Murphy designed custom product displays to fit to the unique layout of event space and showcase them in the best manner.
 

Dew Tour - City, 2013 San Francisco
       
     
Dew Tour - City, 2013 San Francisco

Murphy has designed temporary small structures which can be set up on any surface due to its on ground ballasting system.

Dew Tour, 2012 Ocean City
       
     
Dew Tour, 2012 Ocean City

Custom facade panels were designed and fabricated by Murphy team which can resist winds up to 90 mph, that is category 1 hurricane.

Dew Tour - Beach, 2012 Ocean City
       
     
Dew Tour - Beach, 2012 Ocean City

Murphy has designed and built 130 facade panels to fit truss frames. They can be arranged to different patterns to create 3-dimensional solid surface or porous surface with variety of apartures.

Dew Tour Experience, 2012 - 2014
       
     
Dew Tour Experience, 2012 - 2014

We developed and produced alongside Alli Sports Alliance a premium, focused approach to brand activations and consumer experience on site at the Dew Tour. We focused on bringing a one-of-a-kind premium experience in conjunction with the Tour’s partners where we were able to design a never before seen sponsor village that, to date, has yet to be surpassed on a brand awareness and consumer interaction level within the extreme sports world.   

DIRECTV Studio, 2013 New Orleans
       
     
DIRECTV Studio, 2013 New Orleans

Artie Lange studios were created on a mud field right next to the main tent. Entire landscaping, including concrete driveways, real grass, fountain, were constructed in just few days.

Hot Wheels Double Dare, 2012 Los Angeles
       
     
Hot Wheels Double Dare, 2012 Los Angeles

In 2012, Murphy was teamed up with Mattel and two stunt drivers to defy both death and gravity and prevailed. The drivers pulled nearly 7gs of force to make the 60’ vertical loop around the track, hit a jump and land nearly 20’ on the other side. It took “x amount of hours”, “lbs of steel” to build the jump and nearly “x” of days for 16 seconds and a Guinness World Record Loop.

Photo by Bo Bridges